Nevada, Submarine (SSBN-733) History
On 7 January 1981 the Electric Boat Division of General Dynamics, Gorton, Connecticut, was awarded the contract to build the USS Nevada (SSBN 733); her keel was laid 8 August 1983; she was launched 14 September 1985; Delivered 7 August 1986 and commissioned 16 August 1986.
Nevada currently operates with the Pacific Fleet out of Bangor, Washington.

Displacement 16,808; Length, 560'; Beam 42'; Navigational Draft, 38'; Complement: Officers, 13 -- Enlisted, 140; Armament, Ballistic Missiles

Bibliography
Naval Vessel Register

<< PREV ||| NEVADA INDEX ||| NEXT >>

1  2  3  4